Consider the jobshop plant following the sequence shown in Figure 3.5(b) and described in Table E3.5. Construct

Question:

Consider the jobshop plant following the sequence shown in Figure 3.5(b) and described in Table E3.5. Construct the Gantt charts for overlapping single-product campaigns for products A, B, and C and for the multiproduct campaign with sequence ABCABCABC….Table E3.5 Equipment Processing Times (in Hours) for Processes A, B, and C Process Mixer Reactor Separator

(a) (b) A B C A Mixer Mixer Reactor Reactor B Separator Separator C Figure 3.5 Two Examples of Jobshop Plants