You are required to install temporary fencing to secure a construction site to both, protect people to
Question:
You are required to install temporary fencing to secure a construction site to both, protect people to inadvertently enter the site and endanger themselves and to protect tools and materials from theft. The temporary fencing comes in standard segments of 10 ft (feet) length and can be combined to create any length (but you can not cut segments shorter, they must remain the full length) and shape fence.
Three different construction sites must be fenced, one three-sided, one four-sided and one round. For each construction site to be fenced you have 50 temporary fence segments available to you and you must create the largest possible fenced in area for each of the three different sites.
Create a well-organized spreadsheet using colors, names, and other techniques.
For the three-side and the four-sided construction sites, create at least 4 different iterations of
different layouts to find the largest possible fenced in area utilizing the available fence segments.
Using a XY scatter chart, “draw” each chosen layout for each shape. The shapes should represent your
actual shapes, i.e., equilateral triangle or right-angle triangle .
Income Tax Fundamentals 2013
ISBN: 9781285586618
31st Edition
Authors: Gerald E. Whittenburg, Martha Altus Buller, Steven L Gill