For the same radar in Problem 1.6, assume a duty cycle of (30 %) and peak power
Question:
For the same radar in Problem 1.6, assume a duty cycle of \(30 \%\) and peak power of \(5 \mathrm{~kW}\). Compute the average power and the amount of radiated energy during the first \(20 \mathrm{~ms}\).
Data From Problem 1.6
(a) Calculate the maximum unambiguous range for a pulsed radar with PRFs of \(200 \mathrm{~Hz}\) and \(750 \mathrm{~Hz}\).
(b) What are the corresponding PRIs?
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Radar Systems Analysis And Design Using MATLAB
ISBN: 9780367507930
4th Edition
Authors: Bassem R. Mahafza
Question Posted: