PowerWorld Simulator case Problem 11_27 duplicates the system from Problem 11.24, except the generators are modeled using

Question:

PowerWorld Simulator case Problem 11_27 duplicates the system from Problem 11.24, except the generators are modeled using a two-axis model, with the same \(X_{d}^{\prime}\)

image text in transcribed

and \(\mathrm{H}\) parameters are in Problem 11.24. Compare the critical clearing time between this case and the problem 11.24 case.

Data From Problem 11.24:-

Open PowerWorld Simulator case, which models the Example 6.9 with transient stability data added for the generators. Determine the critical clearing time (to the nearest 0.01 second) for a fault on the line between buses 2 and 5 at the bus 5 end which is cleared by opening the line.

Data From Example 6.9:-

image text in transcribed

image text in transcribedData From Table 6.1 and 6.2 and 6.3:-

image text in transcribed

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Power System Analysis And Design

ISBN: 9781111425777

5th Edition

Authors: J Duncan Glover, Mulukutla S Sarma, Thomas Overbye

Question Posted: