Question: A 14-station transfer line has been logged for 2400 min to identify type of downtime occurrence, how many occurrences, and time lost. The results are
A 14-station transfer line has been logged for 2400 min to identify type of downtime occurrence, how many occurrences, and time lost. The results are presented in the table below. The ideal cycle time for the line is 0.50 min, including transfer time between stations. Determine
(a) How many parts were produced during the 2400 min?
(b) Line uptime efficiency,
(c) Average actual production rate per hour, and
(d) Frequency p associated with transfer system failures.
(a) How many parts were produced during the 2400 min?
(b) Line uptime efficiency,
(c) Average actual production rate per hour, and
(d) Frequency p associated with transfer system failures.
.png)
Type of occurrence Tool changes and failures Station failures: (mechanical and electrical) Transfer system failures Number 70 45 25 Time lost 400 min 300 min 150 min
Step by Step Solution
★★★★★
3.46 Rating (169 Votes )
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Total downtime 400 300 150 850 min Number of downtime occu... View full answer
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
Document Format (1 attachment)
795-C-S-A-I (680).docx
120 KBs Word File
