Question: A deepfoundation engineering contractor has bid on a foundation system for a new world headquarters building for a Fortune 500 company. A part of the

A deep‐foundation engineering contractor has bid on a foundation system for a new world headquarters building for a Fortune 500 company. A part of the project consists of installing 311 auger cast piles. The contractor was given bid information for cost‐estimating purposes, which consisted of the estimated depth of each pile; however, actual drill footage of each pile could not be determined exactly until construction was performed. The Excel file Pile Foundation contains the estimates and actual pile lengths after the project was completed. Develop a linear regression model to estimate the actual pile length as a function of the estimated pile lengths. What do you conclude?

Step by Step Solution

3.39 Rating (155 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Mean Estimated Pile Length ft 2818 Actual Pile Length ft 3456 Actual pile length 0 1 Estimated Pile ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

749-M-S-S-D (3173).docx

120 KBs Word File

Students Have Also Explored These Related Statistics Questions!