Question: A flexible machining system is being planned that will consist of four workstations plus a part handling system. Station 1 will be a load/unload station.

A flexible machining system is being planned that will consist of four workstations plus a part handling system. Station 1 will be a load/unload station. Station 2 will consist of horizontal machining centers. Station 3 will consist of vertical machining centers. Station 4 will be an inspection station. Four the part mix that will be processed by the FMS, the workloads at the four stations are as follows: WL1 = 7.5 min, WL2 = 22.0 min, WL3 = 18.0 min, and WL4 = 10.2 min. The workload of the part handling system WL5 = 8.0 min. The FMS will be operated 16 hours per day, 250 days per year. Maintenance will be performed during nonproduction hours, so uptime proportion (availability) is expected to be 97%. Annual production of the system will be 50,000 parts. Determine the number of machines (servers) of each type (station) required to satisfy production requirements.

Step by Step Solution

3.43 Rating (169 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

R p 12887 pchr 02148 pcmin s 1 Minimum Integer 0214875 161 2 servers loadunload ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

795-C-S-A-I (776).docx

120 KBs Word File

Students Have Also Explored These Related Artificial Intelligence Questions!