Question: (a) In Exercise 5.92 change the acceptance number from 1 to 0 and sketch the OC curve. (b) How do the producers and consumers risks

(a) In Exercise 5.92 change the acceptance number from 1 to 0 and sketch the OC curve.
(b) How do the producer’s and consumer’s risks change if the AQL is 0.05 and the LTPD is 0.3 in both sampling plans?