Question: A plant engineering group needs to set up an assembly line to produce a new product. The table in the next column describes the relationships
(a) Develop a project network for this problem.
(b) Determine the expected duration and variance for each activity
(c) Determine the EST, EFT, LST, LFT, and slack for each activity. Also determine the total project completion time and the critical path(s).
(d) Determine the probability that the project will be completed in less than 34 days.
(e) Determine the probability that the project will take
.png)
DAYS IMMEDIATE PREDECESSORS ACTIVITYa 5 6 10 B, C 7 15 7 9 14 8 10 F, G E, F, H
Step by Step Solution
3.42 Rating (165 Votes )
There are 3 Steps involved in it
tr msoheightsourceauto col msowidthsourceauto br msodataplacementsamecell style0 msonumberformatGeneral textaligngeneral verticalalignbottom whitespacenowrap msorotate0 msobackgroundsourceauto msopatt... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
718-M-S-L-P (1176).xlsx
300 KBs Excel File