Question: A process engineer is considering two sampling plans. In the first, a sample of 10 will be selected and the lot accepted if 3 or
A process engineer is considering two sampling plans. In the first, a sample of 10 will be selected and the lot accepted if 3 or fewer are found defective. In the second, the sample size is 20 and the acceptance number is 5. Develop an OC curve for each. Compare the probability of acceptance for lots that are 5, 10, 20, and 30% defective. Which of the plans would you recommend if you were the supplier?
Step by Step Solution
3.56 Rating (160 Votes )
There are 3 Steps involved in it
The solid line is the operating characteristic curve for the first plan and the dashed line ... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
356-M-S-Q-C-B-S (49).docx