Question: A transfer machine has six stations that function as follows: In addition, transfer time = 0.18 min. Average downtime per occurrence = 8.0 min. A
.png)
In addition, transfer time = 0.18 min. Average downtime per occurrence = 8.0 min. A total of 20,000 parts must be processed through the transfer machine. Determine
(a) Proportion downtime,
(b) Average actual production rate, and
(c) How many hours of operation are required to produce the 20,000 parts?
Process time 0.78 min 1.25 min 0.90min 0.85 min 1.32 min 0.45 min Station Operation pi 1 Load part 2 Drill three holes 3 Ream two holes 4Tap two holes 5 Mill flats 6 Unload parts 0.02 0.01 0.04 0.01
Step by Step Solution
3.42 Rating (161 Votes )
There are 3 Steps involved in it
a T c 132 018 150 min F 002 001 00... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
795-C-S-A-I (676).docx
120 KBs Word File