Question: A very simple product A consists of a base B. and a casting C. The base consists of a plate (P) and three fasteners (F).
A very simple product A consists of a base B. and a casting C. The base consists of a plate (P) and three fasteners (F). There are currently 30 castings and 100 bases on hand. Final assembly takes one week. The casting has a lead time of three weeks. All other parts have one week lead times. There are no scheduled receipts. All components use the lot-for-lot technique. The master schedule requires 80 units of product A in week 5 and 120 units in week 8. Draw the product structure tree for this product and produce the MRP net requirement plans for product A and all its components & parts for the upcoming eight weeks.
Step by Step Solution
3.48 Rating (165 Votes )
There are 3 Steps involved in it
Indented Bill of Materials tem name Distinct items Gross requirements Scheduled receipts On Hand Inv... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
1019-B-C-F-D-F(2220).docx
120 KBs Word File