Question: An electrical engineer supervises the production of three types of electrical components. Three kinds of material-metal, plastic and rubber-are required for production. The amounts needed
An electrical engineer supervises the production of three types of electrical components. Three kinds of material-metal, plastic and rubber-are required for production. The amounts needed to produce each component are

If totals of 3.89, 0.095, and 0.282 kg of metal, plastic, and rubber, respectively, are available each day, how many components can be produced perday?
Plastic, Component g/component g/component g/component Metl, Rubber, 1.0 0.30 0.40 15 17 2 1.5 0.55 19 3