Question: As the quality-control inspector in Exercise 8.83, you are ready for the second phase of the inspection. Listed are three different samples, each taken from
.png)
a. Construct a dotplot of the data.
b. Completely label the dotplot and circle the dots representing cork percents inferior or superior to the limits of specification.
c. State the decision and explain how it was reached.
d. Prepare a short written report summarizing the requirements and your findings and decision for each sample.
Sample 5 5 6 3 7 6 6 7 8 6 6 7 5 7 6 6 745 Sample 2 6 6 8 6 5 7610 6 7 5 7 6 5 6 685 9 Sample 3 5 7 35 5 5 6 5 93 5 779 7 8 510 8 9
Step by Step Solution
3.45 Rating (165 Votes )
There are 3 Steps involved in it
a b Dotplots for each of the samples are located in the graphic below Sample ... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
519-M-S-S-I (2313).docx
120 KBs Word File
