Question: Basic Data Review for Construction Project Equipment Arrangement Use the data in the table above and answer the following questions in the space provided below:
.png)
Use the data in the table above and answer the following questions in the space provided below:
What are the sources of value-added and non-value-added work in this process?
Where are the main opportunities to improve the cycle time of this process, with respect to both actual time used and the potential best times? What strategy would you use?
Step 10: Resolve Open Issues required 104 hours (potential) versus 106 hours (actual). Is there an OFI here? Why or why not? If so, how would you attack it?
What do you think are the most difficult critical issues to deal with when designing a sound cycle time study such as this one?
Cycle Time (hours) Description Potential Difference Step Actual Read basic data package 4 4 Write, type, proof, sign, copy, and distribute cover letter 21.4 21.9 0.5 3 Queue 40 40 3.75 Lead engineer calls key people to 4 4 0.25 schedule meeting Write, type, proof, sign, copy, and distribute confirmation letter 25.4 2.1 23.3 Hold meeting; develop path forward and 4 concems Project leader and specialist develop missing information 12 12 Determine plant preferred vendors 12 12 Review notes from meeting 12 12 104 10 Resolve open issues 106 Write, type, proof, sign, copy, and distribute basic data acceptance letter 26.25 11 26.5 0.25 267.8 151.1 116.7 Totals 2.
Step by Step Solution
3.48 Rating (165 Votes )
There are 3 Steps involved in it
Visit M... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
1258-B-M-A-C-B(2821).docx
120 KBs Word File