Question: A civil engineer involved in construction requires 4800, 5800, and 5700 m3 of sand, fine gravel, and coarse gravel, respectively, for a building project. There
A civil engineer involved in construction requires 4800, 5800, and 5700 m3 of sand, fine gravel, and coarse gravel, respectively, for a building project. There are three pits from which these materials can be obtained. The composition of these pits is

How many cubic meters must be hauled from each pit in order to meet the engineer'sneeds?
ww on Fine Gravel Coarse Gravel Sand Pit 1 Pit 2 Pit 3 30 45 55 25 15 30 55 25 20
Step by Step Solution
3.38 Rating (157 Votes )
There are 3 Steps involved in it
Let x i the volume taken from pit i Therefore ... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
45-M-N-A-N-L-A (107).docx
120 KBs Word File
