Consider a production system consisting of 2 resources M1 and M2. These resources are used to manufacture

Question:

Consider a production system consisting of 2 resources M1 and M2. These resources are used to manufacture two different products A and B. Product A requires a standard time of 4 minutes on resource M1 and 3 minutes on resource M2. Product B requires a standard time of 2 minutes on resource M1 and 8 minutes on resource M2.
Assume that the resources are operated for 8 hours per day and that each resource requires a setup time of half an hour every day.
a. Assume that the daily demand for A is 90 units and the daily demand for B is 60 units. Can the daily demand be met by the current resources?
b. Assume that the firm would like to maximize its flow rate while maintain- ing a daily production mix of 3A's for 2B's. What is the bottleneck resource? What is the maximum flow rate?
c. What would be the flow rate if the capacity of resource 2 were doubled?
Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Introduction to Managerial Accounting

ISBN: 978-0078025792

7th edition

Authors: Peter Brewer, Ray Garrison, Eric Noreen

Question Posted: