Cost elements associated with the operation of the ten-station transfer line in Problem 16.4 are as follows:
Question:
Problem 16.4
A ten-station transfer machine has an ideal cycle time of 30 sec. The frequency of line stops is 0.075 stops per cycle. When a line stop occurs, the average downtime is 4.0 min.