Question: Dixon Robotics manufactures three robot models: the A3B4, the BC11, and the C3PO. Dixon allocates manufacturing overhead to each model based on machine hours. A

Dixon Robotics manufactures three robot models: the A3B4, the BC11, and the C3PO. Dixon allocates manufacturing overhead to each model based on machine hours. A large portion of the company’s manufacturing overhead costs is incurred by the Maintenance Department. This year, the department anticipates that it will incur $100,000 in total costs. The following estimates pertain to the upcoming year:


Dixon Robotics manufactures three robot models: the A3B4, the BC11,


Ed Smith, Dixon’s cost accountant, suspects that unit costs are being distorted by using a single activity base to allocate Maintenance Department costs to products. Thus, he is considering the implementation of activity-based costing (ABC).
Under the proposed ABC method, the costs of the Maintenance Department would be allocated to the following activity cost pools using the number of work orders as an activity base: (1) the repairs pool and (2) the janitorial pool. Of the 2,000 work orders filed with the Maintenance Department each year, approximately 400 relate to repair activities, and 1,600 relate to janitorial activities.
Machinery repairs correlate with the number of production runs of each robot model. Thus, the repairs pool would be allocated to robots based on each model’s corresponding number of production runs. Janitorial services correlate with square feet of production space. Thus, the janitorial pool would be allocated to products based on the square feet of production space devoted to each robot model. The following table provides a summary of annual production run activity and square footage requirements:

Dixon Robotics manufactures three robot models: the A3B4, the BC11,



Instructions
a. Calculate the amount of Maintenance Department costs that would be allocated to each robot model (on a per-unit basis) using machine-hours as a single activity base.
b. Calculate the amount of Maintenance Department costs that would be allocated to each robot model (on a per-unit basis) using the proposed ABC method.
c. Are cost allocations distorted using machine-hours as a single activity base? Explain youranswer.

Model A3B4 BC11 C3PO Estimated Machine-Hours 20,000 15,000 5,000 Estimated Units of Production 6,250 5,000 2,500 Estimated Number of Model A3B4 BC11 C3PO Production Runs 50 150 200 Estimated Square Feet of Production Space Used 5,000 10,000 25,000

Step by Step Solution

3.24 Rating (179 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

a Maintenance department costs allocated to each product line on a perunit basis using machine hours MH Step 1 Compute total MH at normal production levels A3B4 20000 MH BC11 15000 MH C3PO 5000 MH Tot... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

290-B-M-A-J-O-C (1143).docx

120 KBs Word File

Students Have Also Explored These Related Managerial Accounting Questions!