Question: An engineer makes careful measurements with a weir (see Sect. 10.7 later) which monitors a rectangular unfinished concrete channel laid on a slope of 1.

An engineer makes careful measurements with a weir (see Sect. 10.7 later) which monitors a rectangular unfinished concrete channel laid on a slope of
1°. She finds, perhaps with surprise, that when the water depth doubles from
2 ft 2 inches to 4 ft 4 inches, the normal flow rate more than doubles, from 200 to 500 ft3/s.
(a) Is this plausible?
(b) If so, estimate the channel width.

Step by Step Solution

3.35 Rating (155 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

a Yes Q always more than doubles for this situation where the depth doubles Ans a ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

E-ME-FM (1197).docx

120 KBs Word File

Students Have Also Explored These Related Mechanical Engineering Questions!