Question: Facility layout and material flowpath design are major factors in the productivity analysis of automated manufacturing systems. Facility layout is concerned with the location arrangement
.png)
Working Days Design 1 (units) Design 2 (units) 8/16 8/18 8/19 8/20 8/23 8/24 8/25 1,220 1,092 1,136 1,205 1,086 1,274 1.145 1.281 1,273 1,363 1,342 1,471 1.299 1,457 1,263 1,368
Step by Step Solution
3.44 Rating (157 Votes )
There are 3 Steps involved in it
Let m 1 mean output for Design 1 m 2 mean output for Design 2 and m d m 1 m 2 Some preliminary calcu... View full answer