Question: Figure 9.31 shows a concrete dam. Consider Case 1 without the sheet pile, and Case 2 with the sheet pile along the upstream side. a.
Case 2 with the sheet pile along the upstream side.
a. Draw flow nets for both cases.
b. Determine the value of q/k for both cases. (q = m3/s/m; k = m/s.)
c. Determine the factor of safety (FS) against heaving using Eqs. (9.23), (9.24), and (9.24a), for Cases 1 and 2. Comment on any differences in the magnitude of FS.
d. Estimate the seepage force (kN/m3) at point A in the direction of seepage for Cases 1 and 2. Comment on any difference in the magnitude of the seepage force.
.png)
9 m 3.5 m 0.45 mIm 2.26 m 4.75 m Sheet pile e = 0.55 G, = 266 2.49 m l+_ 3.5 m- Rock
Step by Step Solution
3.33 Rating (153 Votes )
There are 3 Steps involved in it
To solve this problem lets go through each step a Draw Flow Nets for Both Cases Flow nets are graphical solutions to Laplaces equation in two dimensio... View full answer
Get step-by-step solutions from verified subject matter experts