Question: Flexible budget formulas and interpolation Required: 1. Using the facts and the flexible budget prepared in Part (1) of P7-7 above, determine the budgeted cost
Required:
1. Using the facts and the flexible budget prepared in Part (1) of P7-7 above, determine the budgeted cost at 96% of capacity, using interpolation.
2. Using the flexible budget prepared in Part (1) of P7-7 above, determine the budgeted cost at 104% of capacity, using a method other than interpolation.
Step by Step Solution
3.35 Rating (173 Votes )
There are 3 Steps involved in it
1 Budgeted cost at 100 9000 Budgeted cost at 90 8800 ... View full answer