Question: In a manufacturing process the assembly line speed (feet per minute) was thought to affect the number of defective parts found during the inspection process.
Line Speed Number of Defective Parts Found
20 ................21
20 ................19
40 ................15
30 ................16
60 ................14
40 ................17
a. Develop the estimated regression equation that relates line speed to the number of defective parts found.
b. At a .05 level of significance, determine whether line speed and number of defective parts found are related.
c. Did the estimated regression equation provide a good fit to the data?
d. Develop a 95% confidence interval to predict the mean number of defective parts for a line speed of 50 feet per minute.
Step by Step Solution
3.47 Rating (157 Votes )
There are 3 Steps involved in it
a The Minitab output is shown below The regression equation is Defects 222 0148 Spe... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
553-M-S-L-R (4354).docx
120 KBs Word File
