Question: Kolbys Korndogs is looking at a new sausage system with an installed cost of $560,000. This cost will be depreciated straight-line to zero over the
Kolby’s Korndogs is looking at a new sausage system with an installed cost of $560,000. This cost will be depreciated straight-line to zero over the project’s five-year life, at the end of which the sausage system can be scrapped for $85,000. The sausage system will save the firm $153,000 per year in pretax operating costs, and the system requires an initial investment in net working capital of $38,000. If the tax rate is 34 percent and the discount rate is 8 percent, what is the NPV of this project?
Step by Step Solution
3.26 Rating (172 Votes )
There are 3 Steps involved in it
First we will calculate the annual depreciation of the new equipment It will be Annual depreciation ... View full answer