Question: Lavertezzo allocates fixed manufacturing overhead to each suit using budgeted direct manufacturing labour-hours per suit. Data pertaining to fixed manufacturing overhead costs for June 2015
Required
1. Calculate the spending variance and the flexible-budget variance for fixed manufacturing overhead. Comment on these results.
2. Calculate the production-volume variance for June 2015. What inferences can Lavertezzo draw from this variance?
Step by Step Solution
3.34 Rating (169 Votes )
There are 3 Steps involved in it
1 Budgeted fixed overhead rate per unit of SFr62400 allocation base 1040 4 62400 4160 SFr 15 ... View full answer