Question: Material requirements are to be planned for component C2 given the master schedule for P1 and P2, and the product structures in. Assembly lead time

Material requirements are to be planned for component C2 given the master schedule for P1 and P2, and the product structures in. Assembly lead time for products and subassemblies (P and S levels) is 1 week, manufacturing lead times for components (C level) is 2 weeks, and ordering lead time for raw materials (M level) is 3 weeks. Determine the time phased requirements for M2, C2, and S1. Assume there are no common use items other than those specified by the product structures for P1 and P2, and that all on-hand inventories and scheduled receipts are zero. Use a format similar to Figure 25.7. Ignore demand beyond period 10.

Step by Step Solution

3.31 Rating (157 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Period 1 2 3 4 5 6 7 8 9 10 Item Product P1 Gross Requirements 50 100 Scheduled Recei... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

795-C-S-A-I (940).docx

120 KBs Word File

Students Have Also Explored These Related Artificial Intelligence Questions!