Question: Production engineers at Sinotron believe that a modified layout on its assembly lines might increase average worker productivity (measured in the number of units produced

Production engineers at Sinotron believe that a modified layout on its assembly lines might increase average worker productivity (measured in the number of units produced per hour). However, before the engineers are ready to install the revised layout officially across the entire firm€™s production lines, they would like to study the modified line€™s effects on output. The following data represent the average hourly production output of 12 randomly sampled employees before and after the line was modified:
Production engineers at Sinotron believe that a modified layout on

At the 0.05 level of significance, can the production engineers conclude that the modified (after) layout has increased average worker productivity?

Employee 2 3 4 5 678 9 1011 12 Before 49 45 43 44 48 42 46 46 49 42 46 44 After 49 46 48 50 46 50 45 46 47 51 51 49

Step by Step Solution

3.54 Rating (164 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Ho d 0 H A d 0 The following data and paired differenc... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

645-M-S-H-T (4062).docx

120 KBs Word File

Students Have Also Explored These Related Statistics Questions!