Question: Refer to E8- 25A. TechSystems needs 83,000 optical switches next year (assume same relevant range). By outsourcing them, TechSystems can use its idle facilities to

Refer to E8- 25A. TechSystems needs 83,000 optical switches next year (assume same relevant range). By outsourcing them, TechSystems can use its idle facilities to manufacture another product that will contribute $ 210,000 to operating income, but none of the fixed costs will be avoidable. Should TechSystems make or buy the switches? Show your analysis.
In E8-25A
Refer to E8- 25A. TechSystems needs 83,000 optical switches next

1 Direct materials 2 Direct labor 3 Variable MOH 4 Fxed MOH 5 Total manufacturing cost for 68,000 units 612,000 136,000 68,000

Step by Step Solution

3.36 Rating (165 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

TechSystems Best Use of Facilities Analysis Make Buy ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

322-B-C-A-D-M (240).docx

120 KBs Word File

Students Have Also Explored These Related Cost Accounting Questions!