Question: Refer to the level 0 DFD in Figure. Study the portion of the figure and accompanying narrative that deal with the capacity requirements planning (CRP)

Refer to the level 0 DFD in Figure. Study the portion of the figure and accompanying narrative that deal with the capacity requirements planning (CRP) process only. Prepare a level 1 DFD for the CRP process (bubble 4.0)only.

Refer to the level 0 DFD in Figure. Study the

Bill of materials master Routing master Move tickets Inventory Manufacturin (production work centers agement process Manufacturing orders 1.0 Design product and Work center master Labor time, material use, and work progress data Finl shed goods Inventory status Productproduction design 4.0 Develop delalled processes Work center statusproduction instructions 5.0 manufacturing events Job time records Engineers Parts master Employee/payroll master data Time phased order requirements schedule RM Issuel return nolces Work center status Master production schedule Raw materlals requisitions Order prooess entry/ sales Sales orders and/or demand forecast 2.0 Generate master production schedule process 3.0 Determine needs for materials RMWIP inventory status Bill of materials master FG inventory status reorder points lead times Open purchase order data Parts master Inventory managemen process Purchase requisitons KEY: FG Finlshed goods RM Raw materlals WIP Work-In-process Purchasing process

Step by Step Solution

3.45 Rating (168 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

FIGURE SM153 Short Problem 153 Solution Master Production Schedule Timephased order require... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

353-B-A-I-S (4684).docx

120 KBs Word File

Students Have Also Explored These Related Accounting Questions!