Question: Rework Example 1 from the case study on Jones Creek for Subbasin C(see PowerPoint). The baseflow for Subbasin C is 200 cfs. In addition, the

Rework Example 1 from the case study on Jones Creek for Subbasin C(see PowerPoint). The baseflow for Subbasin C is 200 cfs. In addition, the initial infiltration for the first hour is 1 in and a constant infiltration of 0.5 in thereafter. The storm hydrograph and rainfall hyetograph for Subbasin C are given in Figures 30a and 30b.
Rework Example 1 from the case study on Jones Creek
Rework Example 1 from the case study on Jones Creek

Hydrograph for Subbasin C 900 800 700 600 600 9 4007 200 100 0 6 112 14 Time (hr) Rainfall hyetograph (Subbasin C) 2.5 1.5 E0.5 0 Time (hr)

Step by Step Solution

3.29 Rating (158 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

First separate out the base flow Total runoff Area of triangle b h Base Flow Area of trapez... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

843-G-E-M (57).docx

120 KBs Word File

Students Have Also Explored These Related Geology Questions!