Road construction contracts in the state of Florida are awarded on the basis of competitive, sealed bids;
Question:
1. Price of contract ($) bid by lowest bidder
2. Department of Transportation (DOT) engineer's estimate= of fair contract price ($)
3. Ratio of low (winning) bid price to DOT engineer's estimate of fair price
4. Status of contract (1 if fixed, 0 if competitive)
5. District (1, 2, 3, 4, or 5) in which construction project is located
6. Number of bidders on contract
7. Estimated number of days required to complete work
8. Length of road project (miles)
9. Percentage of costs allocated to liquid asphalt
10. Percentage of costs allocated to base material
11. Percentage of costs allocated to excavation
12. Percentage of costs allocated to mobilization
13. Percentage of costs allocated to structures
14. Percentage of costs allocated to traffic control
15. Subcontractor utilization (1 if yes, 0 if no)
Use the methodology of this chapter to build a model for low-bid contract price (y). Comment on how the status of the bid affects the price.