Question: =+29 pillars using the parameter estimates given in the output. Then label each pillar as stable if the estimated probability is at least .75 and

=+29 pillars using the parameter estimates given in the output. Then label each pillar as “stable” if the estimated probability is at least .75 and “unstable”

otherwise. How many of the pillars that were actually stable were correctly designated as “stable”?

How many unstable pillars were correctly designated as “unstable”?