Question: An article in Electric Power Systems Research [On the Self-Scheduling of a Power Producer in Uncertain Trading Environments (2008, Vol. 78(3), pp. 311317)] considered a

An article in Electric Power Systems Research [“On the Self-Scheduling of a Power Producer in Uncertain Trading Environments” (2008, Vol. 78(3), pp. 311–317)] considered a self-scheduling approach for a power producer. In addition to price and forced outages, another uncertainty was due to generation reallocations to manage congestions. Generation reallocation was modeled as 110X −60 (with range [−60,50] MW/h) where X has a beta distribution with parameters α = 3.2 and β = 2.8. Determine the mean and variance of generation reallocation.

Step by Step Solution

3.52 Rating (166 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

E110X 60 110 EX 6... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Applied Statistics and Probability Questions!