Samples of size n = 6 are collected from a process every hour. After 20 samples have
Question:
Samples of size n = 6 are collected from a process every hour. After 20 samples have been collected, we calculate x̅̅ = 20.0 and r̅ / d2 = 1.4.
(a) Calculate trial control limits for X and R charts.
(b) If s̅ / c4 = 1.5, calculate trial control limits for X̅ and S charts.
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Applied Statistics And Probability For Engineers
ISBN: 9781118539712
6th Edition
Authors: Douglas C. Montgomery, George C. Runger
Question Posted: