Question: 3. Compute limits for the sample mean x around m 512 such that, as long as a new sample mean is within those limits, the

3. Compute limits for the sample mean x around m 512 such that, as long as a new sample mean is within those limits, the process will be considered to be operating satisfactorily. If x exceeds the upper limit or if x is below the lower limit, corrective action will be taken. These limits are referred to as upper and lower control limits for quality-control purposes.