Question: Assume the case study was put on hold for three months during the middle of construction (after the roof is on but before the interior
Assume the case study was put on hold for three months during the middle of construction (after the roof is on but before the interior finishes are started). Prepare a claim requesting three months’ worth of additional jobsite overhead and impact costs due to the work stoppage.