Question: Prepare an argument why the estimator either should or should not on bid day take the boxed-in quote presented at the end of the cast-inplace

Prepare an argument why the estimator either should or should not on bid day take the boxed-in quote presented at the end of the cast-inplace concrete systems in Chapter 11 for forming the elevated concrete slabs.

Step by Step Solution

3.46 Rating (149 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Argument for why the estimator should take the boxedin quote presented at the end of the castinplace concrete systems in Chapter 11 for forming the elevated concrete slabs 1 Convenience The boxedin qu... View full answer