Which of the project attributes shown in Figure 4.1 can be eliminated and still consider the project

Question:

Which of the project attributes shown in Figure 4.1 can be eliminated and still consider the project successful?

Figure 4.1

Document Cost Schedule Jobsite Team Safety Quality

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Construction Cost Estimating

ISBN: 9780367902681

1st Edition

Authors: John E. Schaufelberger, Len Holm

Question Posted: