Why do civil GC estimators develop work packages for each bid item listed on the contract bid
Question:
Why do civil GC estimators develop work packages for each bid item listed on the contract bid form?
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 50% (4 reviews)
Civil GC estimators develop work packages for each bid item on the contract bid form for several key reasons 1 Accurate Cost Estimation Break down the ...View the full answer
Answered By
Akshay Singla
as a qualified engineering expert i am able to offer you my extensive knowledge with real solutions in regards to planning and practices in this field. i am able to assist you from the beginning of your projects, quizzes, exams, reports, etc. i provide detailed and accurate solutions.
i have solved many difficult problems and their results are extremely good and satisfactory.
i am an expert who can provide assistance in task of all topics from basic level to advance research level. i am working as a part time lecturer at university level in renowned institute. i usually design the coursework in my specified topics. i have an experience of more than 5 years in research.
i have been awarded with the state awards in doing research in the fields of science and technology.
recently i have built the prototype of a plane which is carefully made after analyzing all the laws and principles involved in flying and its function.
1. bachelor of technology in mechanical engineering from indian institute of technology (iit)
2. award of excellence in completing course in autocad, engineering drawing, report writing, etc
4.70+
48+ Reviews
56+ Question Solved
Related Book For
Construction Cost Estimating
ISBN: 9780367902681
1st Edition
Authors: John E. Schaufelberger, Len Holm
Question Posted:
Students also viewed these Business questions
-
List three specific parts of the Case Guide, Objectives and Strategy Section (See below) that you had the most difficulty understanding. Describe your current understanding of these parts. Provide...
-
Managing Scope Changes Case Study Scope changes on a project can occur regardless of how well the project is planned or executed. Scope changes can be the result of something that was omitted during...
-
The documents discussed in this chapter are listed below on the right. Various information items that might appear in them are listed on the left. For each information item listed on the left,...
-
When average total cost is at its minimum: A. Average variable cost is declining with increases in output B. Average variable cost plus average fixed cost is declining with increases in output C....
-
Compute the density for nickel at 500C, given that its room-temperature density is 8.902 g/cm3. Assume that the volume coefficient of thermal expansion, v, is equal to 3l.
-
Gesky Industrial Products manufactures brushless blowers for boilers, food service equipment, kilns, and fuel cells. The company borrowed $18,000,000 for a plant expansion and repaid the loan in...
-
If the RANS equation (17.5) is subtracted from the unaveraged \(\mathrm{N}-\mathrm{S}\) equation (17.1), we obtain the following equation for the perturbation velocity:...
-
Caldwell Mining Co. acquired mineral rights for $127,500,000. The mineral deposit is estimated at 425,000,000 tons. During the current year, 42,000,000 tons were mined and sold. a. Determine the...
-
Consider the below system which is vibrating with sinusoidal input of ?in (38.88?) ?. The damping coefficient of the system is experimentally calculated to be 0.5 ?. ?/?. We locate mass ? 2 along the...
-
An important part of planning manufacturing capacity is having a good forecast of sales. Elizabeth Burke is interested in forecasting sales of mowers and tractors in each marketing region as well as...
-
What does the general conditions section of the estimate represent?
-
Why might a commercial GC decide to self-perform construction of concrete sidewalks instead of hiring a subcontractor for the work?
-
Find all points where the partial derivatives of f(x, y) are both 0. f(x, y) = x 2 + 2x + y 2
-
Find a recent article in which someone or some group proposes a polygraph test to determine whether a person is being truthful. In light of what you know about polygraph tests, do you think the...
-
An economy operating its plant and equipment at full capacity implies a capacity utilization rate of _____. a) 40 percent b) 70 percent c) 85 percent d) 100 percent
-
Indicate true or false for the following statements. If false, specify what change will make the statement true. _______________________ The F distribution is symmetric and has a mean of 0.
-
The range and standard deviation use different approaches to measure variation in a data set. Construct two different data sets configured so that the range of the first set is greater than the range...
-
N = 230, n = 15, k = 200 Compute the mean and standard deviation of the hypergeometric random variable X.
-
How is the use case diagram similar to the context and level 0 data flow diagrams (DFDs)? How is it different?
-
Use the method of Example 4.29 to compute the indicated power of the matrix. 1 0 1
-
Should boards be held responsible for the results achieved by the organizations they governor is that primarily the responsibility of the CEO and staff?
-
Read The Effect of an Online Self-Assessment Tool on Nonprofit Board Performance by Harrison and Murray. (See Articles.) What types of governance issues did the respondents perceive as most...
-
Read The Effect of an Online Self-Assessment Tool on Nonprofit Board Performance by Harrison and Murray. What changes in governance behavior and practices were reported by the survey respondents...
-
1.An investor has $10M half SPY and half fixed income (duration 5 years).He wishes to synthetically change the AA (asset allocation) to 120% equity (beta 1.3), and 20% fixed income (duration 8).He...
-
Imagine that there are 100MM people in the labor force. Currently 3.4MM of those people are in-between jobs. Another 1.5MM (of those 100MM) have been unemployed for more than half-a-year (and we...
-
How to forecast the future exchange rate in the short and long term? Please indicate what factors are relevant, what variables, condition and assumption should be considered. Please be brief and go...
Study smarter with the SolutionInn App