Why should a contractor prepare its own preliminary construction schedule during the estimating process?
Question:
Why should a contractor prepare its own preliminary construction schedule during the estimating process?
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 100% (2 reviews)
Cannot 100 rely on the owners sche...View the full answer
Answered By
Sagar Kumar
I am Mechanical Engineer with CGPA of 3.98 out of 4.00 from Pakistan. I went to Government Boys Degree College, Sehwan for high school studies.
I appeared in NUST Entrance Exam for admission in university and ranked #516. My mathematics are excellent and I have participated in many math competitions and also won many of them. Recently, I participated in International Youth Math Challenge and was awarded with Gold Honor. Now, I am also an ambassador at International Youth Math Challenge,
I have been teaching when I was in 9th class class year 2012. I have taught students from 6th class to university level.
5.00+
1+ Reviews
10+ Question Solved
Related Book For
Cost Accounting And Financial Management For Construction Project Managers
ISBN: 9781138550650
1st Edition
Authors: Len Holm
Question Posted:
Students also viewed these Business questions
-
Managing Scope Changes Case Study Scope changes on a project can occur regardless of how well the project is planned or executed. Scope changes can be the result of something that was omitted during...
-
The Custom Woodworking Company is a small-to-medium-sized custom furniture and cabinet making company, with head-office and a spacious plant site at Industrial Estates, Someplace, BC. Its Chairman...
-
Sixteen boxed-in ethical questions and scenarios were raised in this chapter. Prepare answers for each either as topics to debate in the classroom or as homework assignments to be turned in. Ethics...
-
What important retailing decisions to the target market and retailing marketing mix should be considered when investing in: Dunkin Donuts Little Caesars Pizza Starbucks
-
A 10-lb rod of uniform cross section is used to form the shaft shown. Knowing that the shaft rotates with a constant angular velocity of magnitude 12 rad/s, determine (a) The angular momentum HG of...
-
The following table lists diffraction angles for the first three peaks (first-order) of the x-ray diffraction pattern for some metal. Monochromatic x-radiation having a wavelength of 0.0711 nm was...
-
A consulting professional in a public accounting firm, you have been engaged to establish an internal audit function in the Newman Crosby Corporation, a commercial manufacturer of fabricated steel...
-
You have just been hired as a loan officer at Slippery Rock State Bank. Your supervisor has given you a file containing a request from Lydex Company, a manufacturer of safety helmets. For a...
-
For the following exercise, find f(z) for the function. Answer with exact values only. f(x)=-5x-4
-
How does the 80-20 rule relate to estimate development?
-
Why would you, as a PM or superintendent or cost engineer, want to be involved in the estimate (or schedule) development for your project?
-
Would you expect the electronegativity of titanium to be the same in the species Ti, Ti 2+ , Ti 3+ , and Ti 4+ ? Explain.
-
Find the inverse Laplace transform of \[F(S)=\frac{3 s+8}{(s+2)^{2}(s+5)}\]
-
Are there any circumstances under which a country might want to increase its currencys value?
-
Define internal and external balance, and give an example of how the pursuit of one might cause a problem in achieving the other.
-
How are prices established in the foreign-exchange market?
-
What determines the supply of any given currency in the foreign-exchange market?
-
The Tacoma Narrows Bridge, built across Puget Sound in Washington, formed a standing wave before it collapsed on November 7, 1940. As seen in the photo in Fig. (a) How many full wavelengths were...
-
1. True or False. Pitfalls to consider in a statistical test include nonrandom samples, small sample size, and lack of causal links. 2. Because 25 percent of the students in my morning statistics...
-
As a PM or PE or estimator, would you prefer to work on a projectbased or a home office staff organization, and why that choice? Assume for this exercise that even with a jobsite organization, the...
-
How do the responsibilities of the project manager differ from those of the project superintendent?
-
What is the procurement, pricing, and contracting methods chosen by the owner for the books case study project?
-
A woman on a ten-speed bicycle travels at 9m/s relative to the ground as she passes a little boy on a tricycle going in the opposite direction. If the boy is traveling at 1 m/s relative to the...
-
A truck carrying a film crew must be driven at the correct velocity to enable the crew to film the underside of the plane. The plane flies at 95km/h at an angle of 20 relative to the ground. How fast...
-
How loud is too loud? Loudness can definitely be subjective to the listener, but there are also quantifiable numbers to reference loudness. There are decibel levels that have been proven to cause...
Study smarter with the SolutionInn App