Question: 2. 6.59 When using the modified ROR method to remove multiple ROR values, an additional estimate needed besides the cash flows and their timings is
2. 6.59 When using the modified ROR method to remove multiple ROR values, an additional estimate needed besides the cash flows and their timings is the:
1. ROIC value 2. external rate of return 3. reinvestment rate 4. internal rate of return