Question: 26. Two storage structures, given code names Y and Z, are being considered for a military base located in Sontaga. The military uses a 5
26. Two storage structures, given code names Y and Z, are being considered for a military base located in Sontaga. The military uses a 5 percent/year expected rate of return and a 24-year life for decisions of this type. The relevant characteristics for each structure are shown below.

a. What is the present worth of each machine?
b. What is the decision rule for determining the preferred machine based on present worth ranking?
c. Which structure should be recommended?
First Cost Estimated Life Estimated Salvage Value Annual Maintenance Cost Structure Y $4,500 12 years None $1,000 Structure Z $10,000 24 years $1,800 $720
Step by Step Solution
There are 3 Steps involved in it