Question: A rectangular sharp-crested weir with end contractions is (1.5 mathrm{~m}) long. How high should the weir crest be placed in a channel to maintain an
A rectangular sharp-crested weir with end contractions is \(1.5 \mathrm{~m}\) long. How high should the weir crest be placed in a channel to maintain an upstream depth of \(2.5 \mathrm{~m}\) for \(0.5 \mathrm{~m}^{3} / \mathrm{s}\) flow rate?
Step by Step Solution
3.48 Rating (155 Votes )
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
