Question: (Appendix 3) What can we learn from R 2 , the coefficient of determination? Data from Appendix3 coefficient of determination, R 2 (or R-squared), which
(Appendix 3) What can we learn from R2, the coefficient of determination?
Data from Appendix 3
coefficient of determination, R2 (or R-squared), which measures how much of the fluctuation of a cost is explained by changes in the cost driver. Appendix 3 explains R2 and discusses how to use it to select the best cost driver.
Exhibit 3.6 shows the linear, mixed-cost function for facilities maintenance costs as measured mathematically by regression analysis. The fixed-cost measure is ₤9,329 per month. The variable-cost measure is ₤6.951 per patient-day. The linear-cost function is

Because of their grounding in statistical analysis, the regression-cost measures are more reliable than those obtained from the other methods. Thus, managers would have more confidence in cost predictions from the regression-cost function.
or facilities maintenance department cost 9,329 per month + (6.95 number of patient-days) Method Engineering analysis Account analysis High-low Visual-fit Regression = Y = 9,329+ (6.951 X patient-days) Compare the cost measures produced by each of the five approaches: Fixed cost per month 10,000 9,673 7,270 10,000 9,329 Variable cost per patient-day 5.000 7.500 8.108 7.000 6.951
Step by Step Solution
3.52 Rating (155 Votes )
There are 3 Steps involved in it
The percentage of the variance in the dependent variable here the cost of the facilities maintenance ... View full answer