Question: The table below shows data for the main materials used in a wind turbine: the approximate mass used per (mathrm{kW}) installed and the embodied energy

The table below shows data for the main materials used in a wind turbine: the approximate mass used per \(\mathrm{kW}\) installed and the embodied energy per kg of these materials.

Bill of Materials Mass Per Installed Unit of Power Capacity Embodied Energy

a. Use these data to estimate the total embodied energy of the materials in a 1 MW wind turbine.

b. The capacity factor for a typical land-based wind turbine is \(20 \%\). (Capacity factor is the equivalent fraction of the time that the turbine is operating at its rated capacity; thus a 1 MW turbine produces, on average, the equivalent of \(0.2 \mathrm{MW}\) of electrical power). How long will it take a \(1 \mathrm{MW}\) turbine to return the embodied energy of the materials of which it is made?

Bill of Materials Mass Per Installed Unit of Power Capacity Embodied Energy of Materials (kg/kW) Aluminium 2 (MJ/kg) 200 CFRP 7.5 480 Concrete 500 1.8 Copper 1.5 65 GFRP 7.5 160 Steel 120 25 Neodymium 0.012 85 (magnets) Plastics 5 80

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Machine Elements In Mechanical Design Questions!