Question: Read the previous case. If you worked through this case, use your measured cost functions. If you did not work the previous problem, assume the
Read the previous case. If you worked through this case, use your measured cost functions. If you did not work the previous problem, assume the following measured cost functions:

Required

Y = $9,000/wk + $6 x (direct labour hours); R = 0.10 Y = $20,000/wk + $14 x (number of boards assembled); R = 0.40 Y = $5,000/wk + $350 x (average cycle time); R = 0.80