Question: The project plan should contain at least 3 baselines. Which baseline below is not typically one of the three? a. scope baseline b. risk baseline
The project plan should contain at least 3 baselines. Which baseline below is not typically one of the three?
a. scope baseline
b. risk baseline
c. schedule baseline
d. cost baseline