Question: When using rolling wave planning: a. all work is planned in detail b. near term work is planned in detail and future work is planned
When using rolling wave planning:
a. all work is planned in detail
b. near term work is planned in detail and future work is planned at a higher level
c. near term work is planned at a higher level and long term work is planned in detail
d. all work is planned at a high level
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
