Use the following abbreviations: Prime costs = PC Conversion costs = CC Direct materials
Question:
Use the following abbreviations:
• Prime costs = PC
• Conversion costs = CC
• Direct materials costs = DM
• Direct labour costs = DL
• Manufacturing overhead costs = MOH
Develop an equation that connects PC and CC.